Advertising
Advertising

DR ORJI UZOR KALU’S ROAD PROJECTS AT NNEATO IN UMUNNEOCHI LGA, ABIA NORTH SENATORIAL ZONE.

Advertising

DR ORJI UZOR KALU’S ROAD PROJECTS AT NNEATO IN UMUNNEOCHI LGA, ABIA NORTH SENATORIAL ZONE.

These are some of the road projects done by the Chief Whip of the 9th senate, senator Orji Uzor Kalu in Nneato. Orji Kalu’s works are known, visible and scattered everywhere in Nneato.

What you are lookiing at is..

  1. The construction of 2KM road with ASPHALT & DRAINAGE at Ebelebe-Aroikpa road Nneato.
  2. The construction of 1KM road with ASPHALT & DRAINAGE at Amuba Obulo road, Nneato.

These roads were all done by one contractor called OXFORD CONSTRUCTON & WASTE MANAGEMENT LTD.

Advertising

We speak and mention with evidence, always.

I mentioned earlier that about 62 road projects had been completed by OUK and the ones I showed you right here are parts of the 62 roads.

As I write this, there are THREE NEW ROADS where work is going on in same Nneato in Umunneochi LGA right now. The work started last week and you shall be notified once the contractor is done.

OUK promises and does. I really commend him for all he did and still doing in Abia North. We, the people of Abia North senatorial zone owe him a lot and the only thing we owe him is our collective votes come 2023. He is credible, competent, transparent, upbeat and hard working.

Advertising

OUK is the only man who the Abia North senatorial cap fits. So anyone who loves Abia North should give the working senator Orji Kalu their votes.

OUK is a CAPACITY LEADER..

2023 is a DEAL

Let’s Keep Hope Alive
&

Advertising

BeGuided..

I am Glory Oty

Advertising

Leave a Comment